Course Info

Length: 1 Week

Type: Online

Available Dates

Fees

  • Dec-23-2024

    1,785

  • Jan-13-2025

    1,785

  • Feb-10-2025

    1,785

  • Mar-10-2025

    1,785

  • Apr-14-2025

    1,785

  • May-12-2025

    1,785

  • June-09-2025

    1,785

  • July-14-2025

    1,785

  • Aug-11-2025

    1,785

  • Sep-08-2025

    1,785

  • Oct-13-2025

    1,785

  • Nov-10-2025

    1,785

  • Dec-08-2025

    1,785

Course Details

Course Outline

5 days course

Project and Construction Management

 

  • Select Project Team • Develop Contract • Negotiate Contract • Prepare RFPs or RFQs • Determine Project Scope, Schedule, and Budget
  • Execute Records Retention Policy • Facilitate Client Review and Coordination • Obtain Permits • Prepare Cost Estimates • Prepare Project Deliverables
  • Develop Bidding Criteria • Prepare and Issue Addenda • Facilitate Meetings • Evaluate Bids and Make Recommendations • Identify Delivery Methods • Evaluate Contractor Qualifications • Assist with Construction Contract Execution and Administration
  • Respond to RFIs • Coordinate with Contractors • Facilitate Pre-Construction Meeting • Document Pre-Construction Existing Conditions Attend Final Completion Walkthrough • Prepare As-Built (record) Drawings • Conduct Warranty Review • Conduct Project Close-out • Collect and Analyze Performance Metrics
  • Review Maintenance Services • Prepare Management Plan

Inventory and Analysis


Determine Applicable Codes, Regulations, and Permitting Requirements • Collect Contextual Data • Gather Stakeholder Input • Identify Policy

Objectives • Conduct Project Related Research

Determine Appropriate Types of Analyses • Perform Circulation Analysis • Interpret Utility Analysis • Perform Visual Resource Analysis • Perform

Micro and Macro Climate Analysis • Perform Hydrological Analysis • Perform Vegetation Analysis • Interpret Ecological Analysis • Perform

Topographical Analysis • Interpret Soil and Geotechnical/Geological Analysis • Interpret Environmental Studies

Analyze Codes, Regulations, and Permitting Requirements for Design Impact • Interpret Cultural, Historical, and Archeological Analysis •

Interpret Social Analysis • Interpret Economic Analysis • Analyze Contextual Data • Analyze Stakeholder Feedback

Design


Design and Execute Public Participation Process • Prioritize Stakeholder Goals • Initiate Communication Strategy  

Perform Site Analysis and Determine Opportunities and Constraints • Develop Vision or Framework Plan • Develop and Conduct Urban Plan •

Develop Land Use Plan • Develop Strategic Implementation Plan • Develop Site Master Plan • Develop Historic/Cultural Restoration and

Preservation Plan

Synthesize and Apply the Site Analysis • Develop and Refine the Program • Create the Basis for the Design • Create Conceptual Design

Alternatives and Scenarios • Evaluate Design Alternatives • Refine and Synthesize Concept Alternative • Develop Schematic Design

Grading and Drainage 


Develop Demolition Plan • Develop Existing Conditions Plan • Prepare Soil Boring Location Plan • Develop Stormwater Pollution Prevention Plan

• Develop Site Protection Plan • Develop Mitigation Plan

Develop Layout Plan • Develop General Notes • Develop Grading and Drainage Plan • Develop Planting Practices, Plans, Notes and Schedules •

Develop Materials Plan

Develop Phasing Plan • Develop Irrigation Plan • Prepare Lighting Plan • Develop Site Furnishings Plan

Construction Documentation


Develop Signage and Wayfinding Plan • Develop Traffic Control Plan • Develop Emergency Access Plan • Prepare Stormwater Management Plan

Develop Technical Specifications • Prepare Bid Form/Schedule • Develop Project Manual/Front End Specifications

CASE STUDIES | STRUCTURAL RESOURCES

Course Video